Out of stock
Out of stock
Last edited by luke; 06-15-2019 at 11:05 AM.
will you submit an assembly diagram with the grip when it ships?
like how the m90 frame and m86 frame have?
I forgot. will these be a stock item?
ill take a straight one.
send me order and money will be on its way.
are either one of the ones in the pics available for shipment now. assembled?
I'll take a straight one. PM'd the shipping details.
Alright Luke, i want two straight please. Pm being sent.
Can I use a CCM fitting for the bottom of the LPR foregrip?
I've never done a pnuemag, so I'm try to figure out what types of fittings and other things I need. Search results didn't yield much information.
Only if it's a straight fitting.
You can add me to the list. I'll take a straight.
Got mine today just have to set up the marker tommorow
just to let everyone know, if you didn't these things are amazing.
I love mine.
I'm curious on this, I'd love to pick one up but had one question. I'm waiting on one of the ripper bodies and rails from XMT and was curious if extra milling would have to be done to these frames aside from the routing for the microline. I'm still newish to mags and and am not sure on how foregrips mount on emag length rails.
The only way to tell is to look at the rail, either it has the channel or not.
Thanks, guess I'll go over and ask XMT since I can't see the inside of his rail lol
What are the dimensions of the top of the foregrip where it attaches to the rail? I'm just trying to figure out overhang on my project rail.
Alright The planets have aligned and Saturn is at equinox, where are all the 56 peeps?
I just got another batch of tooling in for the LPR, I think tooling is finally worked out.
Friday all the materials arrived, brass and aluminum.
I'm fully committed to the project, she wont be canceled.
I got the bid in for the two springs needed for the lprs, need some orders so I can get these made.
Just ordered the springs, lead time is 2-3 weeks for delivery...
I finished up the machining on the regs that have been ordered, just waiting for the springs to come in for final assembly..
Springs are here!
I'm going to start packaging and processing the orders after I assemble a few and do the final checks.
I'm going to shoot for delivery on Monday the 30th.
Thank you to the guys that got in on the preorder, it was a very expensive project, I would have been hard pressed to make it happen without your help.
PRE-ORDER PRICING IS CLOSED (6-26-14)
Last edited by luke; 06-27-2014 at 12:45 AM.
Guys. I ran into some issues with the springs I had made, trying to get that figured out.
Also, I've decided to not send these out un-assembled, I just want to to make sure they're working correctly when you get them.
I've had to order another low pressure gauge I managed to blow mine out, looks like it will be Thursday before I can get back on these.
I know most of you have plans to send these out to anno right away, but if at all possible I would like you to (re)test them if possible before sending them to the annodizer. I'm doing all the testing in house that I can, but extra tests with "new eyes" wouldn't hurt with it being a new product.
This project has been a time killer but I'm doing my best to get it done, rest assured it is priority.
Last edited by luke; 07-13-2014 at 08:13 PM.