Results 1 to 30 of 84

Thread: Hybrid Rails

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Jan 2001
    Location
    Cottonwood, Az.
    Posts
    8,188
    Sorry, those Mini's were a one time project. I believe we did name it Ultra Nano Hybrid.

  2. #2
    Join Date
    Jan 2001
    Location
    Cottonwood, Az.
    Posts
    8,188
    h2 Wave 8

    Name:  Lc h2 Wave 8.JPG
Views: 365
Size:  110.9 KB

  3. #3
    Join Date
    Nov 2009
    Location
    Manch Vegas, NH
    Posts
    876
    Are you waiting for some rails to come back from ano? I had a Tac rail ordered.

  4. #4
    Join Date
    Jan 2001
    Location
    Cottonwood, Az.
    Posts
    8,188
    Rails are currently at the anodizer.

  5. #5
    Join Date
    Nov 2009
    Location
    Manch Vegas, NH
    Posts
    876
    Quote Originally Posted by luke View Post
    Rails are currently at the anodizer.
    Thanks, that’s what I figured.

  6. #6
    Join Date
    Jan 2001
    Location
    Cottonwood, Az.
    Posts
    8,188
    No problem.

  7. #7
    Join Date
    Jan 2001
    Location
    Cottonwood, Az.
    Posts
    8,188
    Rails are shipping from the anodizer tomorrow.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •